PPRuNe Forums - View Single Post - Merged: Catalina Ferry to Oz is On
View Single Post
Old 5th Nov 2009, 21:35
  #91 (permalink)  
Wingnuts
 
Join Date: Jul 2003
Location: Yorkey's Knob
Posts: 119
Likes: 0
Received 0 Likes on 0 Posts
It seems the left engine problem is still unresolved (L. carby AMC change may have fixed it?) but there is no urgency due to the unavailability of avgas.

Two major refineries that supply avgas to the region are out of action and as a consequence the Indonesian government has quarantined all avgas in Indonesia for its military until supplies are back to normal.

It is believed the crew has returned home.

PS There is a good chance the DC4 drivers will begin endorsing themeselves for their ferry at end of this month.

Exxon Mobile to shut down its Singapore refinery for maintenance
By Senthil Kumar | 01/09/2009 |
As per the media reports, its smaller Singapore refinery would be shut down by Exxon Mobile, for its first major maintenance turnaround since 2007.
The time decided for the shutdown is May to June 2010; and it will be in stages such that both crude distillation units in the 296,000 per day Jurong Island refinery can be taken down. Apart from this, secondary units will also be taken.

Shell May Shut Singapore Hydrocracker For Maintenance
SINGAPORE -(Dow Jones)- Royal Dutch Shell PLC (RDSB.LN) may take a hydrocracker with a daily capacity of 34,000 barrels at its Singapore refining complex offline in mid-September for a two-month maintenance, traders said Thursday. A Shell spokesman declined to comment. However, an earlier company publication said the company planned to carry out upgrades and modification work at its hydrocracking unit in Singapore this year, without specifying an exact timing. A hydrocracker generally processes fuel oil into lighter products, such as middle distillates and gasoline feedstocks. -By Max Lin, Dow Jones Newswires; 65-6415-4063; [email protected]

Last edited by Wingnuts; 5th Nov 2009 at 22:01.
Wingnuts is offline