Even if the 3rd runway was given the go ahead tomorrow it would take 6/10 years to plan build and open , far too long for MME if that is going to be the saviour. As it isn't going to happen at all it is not really relevant. Times and attitudes have changed and the MME London routes whichever you choose are no longer viable.