The standard wind farm met mast is 70m (229 feet high). Before a developer can apply for a wind farm it is required that he sites a met mast for up to 6 months to prove the wind speeds are sufficient to justify it. Installation is approved through the planning process and MOD are consulted (depsite not being a statutory consultee). Coords are passed to AIDU and they are marked.