DFC, thanx had a look at it. Indeed it's a little note on the usual diagram reflecting SID design criteria which is easily overlooked. VOl II gives a clearer picture
the position and height of close-in obstacles penetrating the OIS. A note shall be included on the departure chart wherever close-in obstacles exist which were not considered in the determination of the published procedure
design gradient (PDG) (see Figure II-3-2-3 in Chapter 2);
Well, in practical terms spoken, what consequences does it have? Any idea?