is your nav so bad you can't plot a windmill?

As far as I know they are fixed objects.
Good one!

See current list of active notams below; will send my maps over so you can plot them all for me! Deal?
OBST ERECTED ONE WINDTURBINE AT 580821N0143517E HGT 328FT ELEV
991 FT LGT FLG R.
14AUG09 0705 - PERM (ES/1/E0507/09)
OBST ERECTED TWO WINDTURBINES AT GROTLINGBO 570452N0181949E HGT
410FT ELEV 443FT LGT FLG R.
11JUN09 0636 - PERM (ES/1/E0362/09)
OBST ERECTED MAST AT SKANES FAGERHULT 562037N0133015E HGT 328FT
ELEV 771FT LGT F R.
24JUL09 0651 - PERM (ES/1/E0462/09)
OBST ERECTED AT FEMSJO 565403N0131430E HGT 328FT ELEV 843FT LGT
F R.
22SEP09 1242 - PERM (ES/1/E0621/09)
OBST ERECTED WINDTURBINE AT BORRBY 552822N0141012E HGT 331FT
ELEV 479FT LGT FLG R.
01OCT09 0815 - PERM (ES/1/E0643/09)
OBST ERECTED TWO WIND POWER PLANTS AT TORSAS PSN 5625N01605E.
HGT 456 FT, OBST LGT NOT AVBL.
01OCT09 1001 - 30OCT09 1500EST (ES/1/E0645/09)
OBST 0025 HALMSTAD/OSKARSTROM POS 564723N0125616E OBST LIGHTS
OUT OF SERVICE.
06OCT09 1231 - 20OCT09 1200EST (ES/1/E0656/09)
OBST ERECTED TWO WIND POWER PLANTS AT ASPINGE PSN 5547N01324E
HEIGHT 390 FEET, OBST LGT NOT AVBL.
15SEP09 1448 - 09OCT09 1400EST (ES/1/E0603/09)
OBST ERECTED TWO WIND POWER PLANTS AT KLEMEDSTORP PSN
5547N01324E HEIGHT 390 FEET, OBST LGT NOT AVBL.
15SEP09 1459 - 09OCT09 1400EST (ES/1/E0604/09)
OBST ERECTED WINDTURBINE AT ERIKSTORP 582716N0133201E HGT 485FT
ELEV 872FT LGT FLG R.
01OCT09 0812 - PERM (ES/1/E0642/09)
OBST ERECTED ONE WINDTURBINE AT SKANNINGE 582413N0150804E HGT
328FT ELEV 607FT LGT FLG R.
14AUG09 0652 - PERM (ES/1/E0502/09)
OBST ERECTED ONE WINDTURBINE AT KLOCKRIKE 582854N0152134E HGT
328FT ELEV 558FT LGT F R.
14AUG09 0655 - PERM (ES/1/E0503/09)
OBST ERECTED FOUR WINDTURBINES AT SKARHULT 554702N0132210E HGT
390FT
ELEV 607FT LGT F R.
14AUG09 0700 - PERM (ES/1/E0505/09)
OBST ERECTED SIX WINDTURBINES AT LUNDSBRUNN 582701N0132841E HGT
456FT ELEV 882FT LGT F R.
24AUG09 1306 - PERM (ES/1/E0528/09)
OBST ERECTED FOUR WINDTURBINES AT SOLVESBORG 560413N0144014E
HGT 328FT ELEV 351FT LGT F R.
24AUG09 1311 - PERM (ES/1/E0530/09)
OBST ERECTED FOUR WINDTURBINES AT ASPINGE 554718N0132427E HGT
390FT ELEV 725FT LGT FLG R.
31AUG09 1156 - PERM (ES/1/E0541/09)
OBST ERECTED FOUR WINDTURBINES AT HULTET 562300N0154501E HGT
492FT ELEV 846FT LGT FLG R.
04SEP09 0932 - PERM (ES/1/E0552/09)
OBST ERECTED THREE WINDTURBINES AT KUNGSHULT 555049N0132856E
HGT 456FT ELEV 751FT LGT F R.
04SEP09 0935 - PERM (ES/1/E0553/09)
OBST ERECTED FIVE WINDTURBINES AT KRISTIANSTAD 560419N0141031E
HGT 410FT ELEV 469FT LGT FLG R.
04SEP09 0937 - PERM (ES/1/E0554/09)
GROUP OF 3 OBST ERECTED AT KRISTIANSTAD 560232N0140339E HEIGT
456 FT
ELEV 489FT UNDER CONSTRUCTION NO OBST LIGHTS.
30SEP09 1306 - 31OCT09 1300EST (ES/1/E0637/09)