Taxiway works
Sorry about the grammar NAVPI my point was that T/way D closed so the singapore was towed thru work on T/way L.but half way thru the tow they decided to open Delta to allow the Globespan to taxi in. What was the point in having the Singapore towed out when they could have removed the barrier on T/way Delta, to allow him to taxi out via delta and Alpha to 23L. Seems that the airport have lost the plot