Standard rate = UTBN1 1360Kg rate/52 =$33,172/52=$637.94
The way I see it is a RPT turbo jet Captain gets the award rate, plus:
Turbo Jet = 1280% of Standard Rate
ATPL= 604% of Standard Rate
IFR = 732% of Standard Rate
=(2616%/100)*$627.94
= $6,480.52