Following the early bath of UKIA ( not the airport's fault, the plan was never going to work with that airframe and MK at the helm), the airport is still hungry for a scheduled long haul service.
Regrettably, until the disembarkation / embarkation scrum on the main apron, and the struggle to and through immigration, can be resolved, it looks like being a long wait.