widgeon,
Bond, according to G-INFO database, was 8 and 3 now 7 L2's and 2 EC225's just for the sake of accuracy (also operate L2 for JIGSAW)
As for the inspection of the epicyclic, when ever we take something apart, no matter what it is, we usually inspect everything with a fairly detailed visual inspection anyway, weather mandated by the maintenace procedure or not. its just good engineering practice.
Last edited by you want what??; 4th May 2009 at 02:27.