sapera is confusing 2 issues'
1 is a requirement of 1992 for the DGCA (By AIC) to interview Pilots before they can operate different eqpt in another domestic airline.
2. The second is a CAR isued in Aug 2005 requiring Pilots to give 6 months notice before jumping ship.
Even after 6 month notice as per CAR , the AIC interview is required,