There is problems all over. In Durban there are 9 controllers left to cover 6 shifts with 2 chiefs helping out. One shift was dropped to help out with staffing and shifts made longer :4-5 hours without break. One patc leaving in November.
AND WE STILL HAVE TO STAFF KING SHAKA AIRPORT WITH DURBAN FOR 2010