PPRuNe Forums - View Single Post - Initial R/T call to London control correct phraseology
Old 1st Apr 2009, 14:21
  #2 (permalink)  
Dumbledor
 
Join Date: Nov 2002
Location: Hogwarts
Posts: 229
Likes: 0
Received 0 Likes on 0 Posts
Cool

Only the 1st call to any radar unit after T/O should include passing level/alt, unless requested by ATC. All initial calls to any radar unit should include cleared level/alt.

D
Dumbledor is offline