Good grief, is there not a Lockheed rep with the RAF now?
IF so, is he not listened to?
Lockheed lost the TriStar support contract to Marshall in 2005.
I know when I was at Brize I had a real good rapport with both the engineering and maintenance staff.
One problem I did see when I was with the RAF was that they would not ulitized the rep away from Brize. I think it was an insurance problem with the RAF, not Lockheed as we had many reps in hot areas. If here was a problem away from Brize there was no hands on support, you had trouble shoot by faxes and phone calls.