PPRuNe Forums - View Single Post - Airbus crash/training flight
View Single Post
Old 13th Jan 2009, 07:39
  #415 (permalink)  
Karl Bamforth
 
Join Date: Jan 2006
Location: Oxfordshire
Posts: 131
Likes: 0
Received 0 Likes on 0 Posts
With reference to the engine barrel nut AD.
EASA required the inspection/rectification to be carried out within 7 days of the effective date of the AD. IE 28th October, quite some time before the crash.
Karl Bamforth is offline