PPRuNe Forums - View Single Post - New SID RT Procedures -12 March 09
View Single Post
Old 11th Jan 2009, 09:20
  #1 (permalink)  
A4

Ut Sementem Feeceris
 
Join Date: Jul 1999
Location: UK
Posts: 3,467
Received 156 Likes on 32 Posts
New SID RT Procedures -12 March 09

Hi,

Don't know how long this will stay in "News" but a heads up for all who fly in UK airspace. New RT procedures coming soon - with a potential for "problems" if people don't know the new procedures.......

FODCOM can be found here: http://www.caa.co.uk/docs/33/FOD200901.pdf

The important bit......

3 New UK Procedures and Phraseology

3.1 SIDs

3.1.1 Under the new procedures, when a departing aircraft is cleared to climb above the initially cleared level or the levels specified in a SID, the aircraft shall still follow the published vertical profile of the SID unless such restrictions are explicitly cancelled by ATC.

3.1.2 Consequently, when the aircraft is required to follow the published vertical profile of the SID the new UK phraseology is:
“Callsign, climb FLXXX”,
e.g. “JET123, climb FL100”.
In this example, assuming an upper SID level below FL100, the pilot will follow the published vertical profile of the SID and, only after passing the end of the SID, commence a climb to FL100.

3.1.3 However, when the aircraft is required to climb immediately to a level above the final level on the SID, or above the initially cleared level if this is below the SID upper level, the phraseology is:
“Callsign, climb FLXXX, SID level restrictions cancelled”,
e.g. “JET123, climb FL100, SID level restrictions cancelled”.
In this example, assuming an upper SID level below FL100, the pilot will climb directly to FL100 without reference to any part of the published vertical profile of the SID including any minimum height requirements.

Fly safe and Happy New Year,

A4
A4 is offline