PPRuNe Forums - View Single Post - BA and Project Columbus
View Single Post
Old 30th December 2008 | 19:35
  #76 (permalink)  
Olympus593
 
Joined: Apr 2006
Posts: 19
Likes: 0
From: Airline Utopia
WW is offering severance to the upper enchelons of the management structure. The same people will, undoubtebley ,return on over -inflated rates as consultants, therefore costing BA more in the long term.
History has a habit of repeating at BA, despite lessons "learnt".

Its all number crunching, targets met bonus and back patting on the so called results.

Olympus.

Last edited by Olympus593; 30th December 2008 at 19:58.
Olympus593 is offline