The main point that l can make out, is that the link between the MI and the airport may well be opened by next weekend
It will be interesting then to see how the traffic from the airport merges with the A505 as without a dual carriageway section under the bridge, traffic from the airport would have to give way to traffic on to the A505. As this junction has not been designed with a slip road then this will just mean delays as traffic will have to join the road from a standing start.
Still think that just the section from Gypsy Lane will be open for Christmas but we will see.