David
I'm certain that the pulling of the routes wasn't done on a whim and that negotiation to retain them was lengthy: if an airport or region doesn't want to accept the conditions of the contract or elects to to apply a variation subsequent to agreeing the contract they have to be pretty sure of their case. The loss of revenue and jobs is severe and any renegotiation is bound to be on even more Draconian terms.