Spitoon Your post encapsulates what I was trying to say in my clumsy way "what you mean is that the station operator must comply with the conditions of the licence or approval related to the operation of the equipment."
DAP don't allocate the callsign but can refuse to allow the use of a proposal, as in the case of TC moving South from WD.
BD