PPRuNe Forums - View Single Post - EOSID
Thread: EOSID
View Single Post
Old 11th November 2008 | 23:29
  #3 (permalink)  
CortaVento
 
Joined: May 2004
Posts: 15
Likes: 0
From: sunny side up
From ICAO Doc. 8168

" Chapter 1- General Criteria for Departure Procedures

1.1.1.2 - These procedures assume that all engines are operating...

1.2 - Operators Responsibility

1.2.1 - Contingency Procedures

Development of contingency procedures, required to cover the case of engine failure or an emergency in flight which occurs after V1, is the responsibility of the operator,in accordance with Annex 6 " ....


Take a look at this previous thread:
http://www.pprune.org/tech-log/18827...ml#post2067653

Hope this helps,

Last edited by CortaVento; 12th November 2008 at 00:04.
CortaVento is offline  
Reply