PPRuNe Forums - View Single Post - JSF and A400M at risk?
View Single Post
Old 4th Nov 2008, 20:14
  #199 (permalink)  
Truckkie
 
Join Date: Jan 2007
Location: GONE BY 2012
Age: 51
Posts: 151
Likes: 0
Received 0 Likes on 0 Posts
On a serious note, is our AT requirement not heavily or utterly relient on this platform? I hear the J needs rewinged in circa 2012 and is knocking up an eyewatering FI. The Tristar is having the guts ripped out of it's cockpit imminently. Are we at risk of a dreadful shortfall of airlift for the guys who so desperately need it in theatre?
That's about right:-

12 very tired C130Ks reduce to 9 next year - just enough to maintain support to DSF and UK standbys. OSD 2012
C130Js racking up FI - first outer wing due replacing on fleet leaders in 2012. SF upgrade programme due to start 2010 through to 2012/13 - removing line airframes for modernisation.
Tristars OSD now 2014 - cockipit/avionic upgrades and fuel system overhaul permitting - cue Marshalls delays
VC10 - very, very tired.
C17 - brilliant but not enough airframes or crews - full fleet not operating until 2011/2012
A400M - original ISD 2010/2011 now slipping right at a vast rate of knots.
FSTA - 2009/10 - are you having a laugh?

2012 is being called the 'perfect storm' in the AT world when the airframe situation becomes critical.

Couple this with the move of Lyneham to Brize and the upheaval of the infastructure of the entire C130 fleet plus the continuing demands of operations and something called the Olympics!!

We will not have enough AT to support current ops, never mind anything else
Truckkie is offline