open days
I just came back from the sim assesment this monday Doha things went well got change from the 777 sim to the 320 sim as it was busy at the time , the assesment was basic take off ,engine failure while cleaning aircraft ,ils single engine with a go around came back to land 1 engine, take v1 cut relight the engine came back for a visual circuit and land 2 engines.
Last edited by hans37pilot; 31st Oct 2008 at 06:56.