London City Sid's all have a stepped climb appart from BPK Sid, all the other Sid's (SAM, LYD, DVR, CLN and CPT) the clearance is given including "maintain xx feet" and is a mandatory readback. This came in following several level bust through not following the stepped climb procedure. Otherwise a lot of form filling is required, which we do not enjoy