kenparry,
I think you'll find that the ADP in the C hyd system of the B767 is a bit simpler than that. Think ETOPS - L and R hyd systems EDP + electric demand hyd pump, C hyd system electric pumps (2) + what for demand? Only ADP is left for redundancy unless there is the messy complication of PTU and then from which hyd system?