PPRuNe Forums - View Single Post - Ground Run after Engine Changes
Thread
:
Ground Run after Engine Changes
View Single Post
20th October 2008 | 03:45
#
8
(
permalink
)
411A
Joined:
Mar 2000
Posts:
8,571
Likes:
3
From:
Arizona USA
4-engine types, symetrical pair, and usually both near high power.
TriStar.
The last two engine changes I've seen were 8 hour affairs to install, ground run for leak check, and one (only) high power run.
Reply
0
0
411A
View Public Profile
Find More Posts by 411A