If you look at the tunnel with the taxiway above, the 'People mover' was due to fill the third lane (currently redundant) beneath. It was to link the Tinminal and the Parkway.
Passengers arriving by train would have checked in at the Parkway then proceeded to the airport via this transport link.
All were 'cost engineered' out of the project.