PPRuNe Forums - View Single Post - The big merged L1011 thread
View Single Post
Old 26th Sep 2008, 00:57
  #327 (permalink)  
OldCessna
 
Join Date: Feb 2003
Location: PBI
Posts: 215
Likes: 0
Received 0 Likes on 0 Posts
411A
Deferred by relevant CAA iaw RR documentation, and have the LOA to prove it.
Limited time only, however.


I can only assume it will cover the Hajj then?

Sort of making a pilgrimage in more ways than one?
OldCessna is offline