For both scenarios, the design life of the pavement was cut from 20 years to 12-13 years. If the airport is charging a landing charge per tonne, then simplistically the charge should rise by about 50%.
Almost every airport charges per ton of
maximum take-off weight. By your logic, shouldn't we be getting a refund for operating lighter than maximum?