Snowfalcon2
I think the idea is that the ice forms in the pipes and collects on the face of the heat exchanger. The procedures attempt to dislodge the ice before enough builds up to cause a problem. I can see the need to do the powerback and wait(hope) shortly after the pre descent power up!!