PPRuNe Forums - View Single Post - CHC Africa Closing Down
View Single Post
Old 14th Aug 2008, 12:42
  #68 (permalink)  
unstable load
 
Join Date: Dec 2006
Location: Here and there...
Age: 58
Posts: 854
Likes: 0
Received 0 Likes on 0 Posts
If I recall correctly the contract was for 3 machines. Court/CHCA got away with having the 3rd ship in the docks on the basis that it could be there in short order and then they could use it for shipservice as opposed to letting it stand in GRG.
unstable load is offline