We are operating 7 AW139 for the UAE Air Force this year there has been very few problem as compared to last year. Like I said before we inspected all A/C systems and serviced them when the temperature started to climb above 35 degrees.
The post production problems such as bad connector and drive pulley's coming loose I think we have sorted them out.