PPRuNe Forums - View Single Post - Afghan airbridge trial
View Single Post
Old 1st Jul 2008, 18:14
  #33 (permalink)  
Uncle Ginsters
 
Join Date: Jun 2000
Location: In the Ether
Posts: 437
Likes: 0
Received 0 Likes on 0 Posts
bad time to start a trial in midsummer
That's exactly the point! But as an A2, you know that, right?

At this time of year, the WAT limit and other perf factors are at their most limiting.

Despite your experience, on the current schedule, the Tristar is severely perfomance limited. By reducing leg length and thus fuel load, the freight (self-loading or otherwise) can be increased and thus more task achieved

Now, where did I leave those 4 coloured pens???
Uncle Ginsters is offline