PPRuNe Forums - View Single Post - Very late go-around at Geneva
View Single Post
Old 25th Jan 2002, 16:34
  #4 (permalink)  
Zeppelin
 
Join Date: Mar 2001
Location: UK/Spain
Posts: 71
Likes: 0
Received 0 Likes on 0 Posts
Post

With regard to the delayed PA, the period after a go-around can be a time of high work load- clean up, talking to ATC, radar headings, re setting the approach etc. And on this occasion seeing if the cabin was secure. Sometimes it is just not possible to do an immediate PA, the priority being to fly the aircraft, remember this is also an area of high terrain.
Zeppelin is offline