PPRuNe Forums - View Single Post - Radio-com failure when on radar vector
View Single Post
Old 3rd Feb 2001, 11:43
  #3 (permalink)  
berley_boy
Guest
 
Posts: n/a
Post

In Australia the procedure is slightly different. Quote straight out of Jepps;

If Being Radar Vectored-

Maintain last assigned vector for two minutes; and

Climb if necessary to minimum safe altitude, to maintain terrain clearance; then

proceed in accordance with the latest ATC route clearance acknowledged.

Hope that helps Ondrej. Cheers.