PPRuNe Forums - View Single Post - Vulcan XH 558 Threads (merged)
View Single Post
Old 5th Jun 2008, 12:42
  #1344 (permalink)  
kiwibrit
 
Join Date: Feb 2008
Location: Lincolnshire
Posts: 106
Likes: 0
Received 0 Likes on 0 Posts
I've changed a Vulcan undercarriage in an 8 hour shift (with time to spare) and it's not that difficult to do with the right tools and GSE.
As a former Vulcan SEngO I'd say that was going some, especially if jacking and de-jacking is taken into account. Maybe as a planned second/third line task with everything planned just right you could. Even so, I would have been impressed if I could have had that done in 8 hours by the ME(A)S guys in my day.
kiwibrit is offline