PPRuNe Forums - View Single Post - The venerable Bell 47
View Single Post
Old 2nd Jun 2008, 12:54
  #181 (permalink)  
topendtorque
 
Join Date: Feb 2005
Location: Australia
Posts: 1,957
Likes: 0
Received 0 Likes on 0 Posts
To me it looks like less than 2 man days of work.
Fair comment, but there is the small matter of checking of ALL of the relative AD's, and performing a full 100 hrly inspection, even without any other inspection that may be due.

A 100 hrly will take at least two man days on a '47 machine that has absolutely no problems.

If it was an initial into country C of A inspection then in OZ that would be at least $6000.00

You may have done very well.
tet
topendtorque is offline