more likely to be very bad luck!
from what i understand most of the schedule only requires 4 out of the 5 current aircraft, so to have 3 of them go tech all at the same time is very bad luck!
how many airlines can absorb 60% of aircraft going tech and still operate a normal service ?
from rumours on another site it seems as though a/c 6 is likely to be arriving very soon