Just to emphasise that the 12 hours in previous 24 months can be substituted by LPC with a CRE and 2 hours in previous 12 months. Much cheaper.
The O in OPC is Operators (Proficiency Check), it's JARspeak for base check. ie the LPC replaces the Schedule 8 stuff and the OPC the Schedule 10 stuff.
------------------
Another day in paradise