In the uk we use the system where the a/c is deemed to have been accepted if an estimate has been passed(either electronically in most cases, or verbally) and no objection is raised ,so the a/c can be transferred without a handover, unless its at an ODL or doing something non standard. Its a good system and seems to work. I cant imagine what would happen if we had to do a phone call for every plane.