seems odd given that the Bo105s are going out of service.
Still got a year left, time enough to get the contract up and running with a Bolkow and then upgrade to a 135.
Lots of speculation in this thread, and same from the industry media. Interesting to note though that no one has actually confirmed that the contract
will be a 109 from Sloanes, even though the paramedics were conducting training with a 109 at Filton last year.