Southend wants to increase the length of the run-off areas at each end of the runway to comply with the latest CAA requirements for passenger jet operations. There is a railway at one end and a church at the other, so the plan is to move the church. But they they are only looking at B737 sort of size though.. .. . <a href="http://www.southendairport.net/" target="_blank">Southend Airport</a>