The problem from a busy ATC point of view is that indeed the R/T loading is reduced BUT there is no "trigger" for the aircraft to be transfered to the tower frequency. A busy controller will have all but dismissed this aircraft to focus on other conflictions, and this often leads to the pilot having to "prompt" for a frquency change further down the ILS..