Pasoundman
What i was implying was it went well from a Airside Ops BAA/HAL with lots of planning and extra staff on duty ensuring we delivered our side of the move. Not so well from a BA perspective with lack of planning etc and the staff not knowing what equipment had to be moved and what equipment was needed for the flights out of T4