I can be certain of the name of the engineer but he had with him a detained photograph album that depicted the work on stretching NAAB from start to finish, from the welder making the initial cutting to the plug being added and its final acceptance or handing over of the finished product. I remember him saying that eurocopter supplied new wiring looms that were basically equal in length to the length of the stretch.