PPRuNe Forums - View Single Post - Northrup Grumman/EADS win USAF tanker bid
Old 29th Feb 2008, 23:21
  #39 (permalink)  
D-IFF_ident
 
Join Date: Nov 2000
Location: Far far away
Age: 53
Posts: 715
Likes: 0
Received 0 Likes on 0 Posts
I think the construction of the frames in Mobile should mean that Airtanker still get their frames of the line in the EU, but then again I'm not sure the FSTA frames even have a production line number assigned yet do they? And what you doing up at this time of night Tonks?
D-IFF_ident is offline