At what point does the whole B777 ETOPS get re-examined? How many in-flight engine shutdowns are they allowed for the type, or will politics make the FAA et al a bit slower to act? I can imaging the chaos on Pacific routes if the type had to take longer trips to stick within 2 hours of land.