the official blurb mentions a 25% reduction in capacity. I was told by a controller that it would be 50%
The official reduction will be 25% off the normal values for the different sectors. However we regularly operate above these values, so the actual reduction might indeed be higher.
Anyway the big date now is 20/02 when the final shadow trial will take place and we will know if the system is ready to go live. If this works out, then we are ready for liftoff on 29/02!