Is this the one? (taken from Eurocontrol CMFU AIM)

NEW FDPS MAASTRICHT UAC
.
VALID 14/02/08 TO 31/03/08
.
A NEW FLIGHT DATA PROCESSING SYSTEM IS BEING IMPLEMENTED IN
MAASTRICHT (EDYY) UAC.
THE TRANSFER TO THE NEW SYSTEM (NFDPS ) WILL BE CONDUCTED TO
ENSURESAFE ATC OPERATIONS AND TO MINIMIZE THE IMPACT TO AIRCRAFT
OPERATORS .
EN-ROUTE CAPACITIES WILL BE REDUCED BY MAX 25 PER CENT.
.
ATFM REGULATIONS WILL BE APPLIED FOR EDYY UAC IF TRAFFIC DEMAND
EXCEEDS THE REDUCED CAPACITY FIGURES.
REROUTEING SCENARIOS WILL BE APPLIED AS NECESSARY TO BALANCE THE
TRAFFIC AND MINIMIZE DELAYS. AIRCRAFT OPERATORS ARE STRONGLY
REQUESTED TO EXPLOIT FULLY THE AVAILABLE REROUTEING SCENARIOS IN
ORDER TO BALANCE THE FLOWS. FAILURE TO DO SO WILL INVOLVE
ADDITIONAL ATFM REGULATIONS THAT MAY NEED TO BE APPLIED AT SHORT
NOTICE TO PREVENT OVERLOADS.
ANY SIGNIFICANT DELAYS EXPERIENCED WILL BE GIVEN DUE
CONSIDERATION BY
CFMU AND REROUTE PROPOSALS (RRP) OR CHERRY PICKING MAY BE OFFERED
TO AIRCRAFT OPERATORS.
.
FOR TRAFFIC FLYING VIA EBBU/BRUSSELS ACC OPERATORS ARE ADVISED
THATSHORT TERM TACTICAL MEASURES MAY BE APPLIED AS NECESSARY AND
FLIGHTLEVELS ALLOCATED MAY BE FROM 2000 TO 4000 FEET LESS THAN
FILED IN FPL/RPL.
AIRCRAFT OPERATORS ARE REQUESTED TO ENSURE THIS IS TAKEN INTO
ACCOUNT
FOR FUEL PLANNING PURPOSES AND THAT FLIGHTDECK CREWS ARE BRIEFED
ACCORDINGLY.
.
*
FULL DETAILS ARE AVAILABLE FOR CONSULTATION ON THE EUROCONTROL
CFMUWEBSITE UNDER THE FOLLOWING HEADING:
CFMU OPERATIONAL SERVICES/FLOW AND CAPACITY MANAGEMENT/SCENARIOS/
EDYY NEW FDPS.
.
AN OPERATIONAL TRIAL WITH ATFM REGULATIONS AND SCENARIOS IS
PLANNEDFOR 20/02/08. RESULTS OF THIS ONE DAY TRIAL WILL BE
ASSESSED AND PRESENTED TO ADJACENT ACCS/FMPS AND AO
REPRESENTATIVES ON 22/02/08.
ANY NECESSARY FINE TUNING OF MEASURES WILL BE INCORPORATED PRIOR
TO THE OPERATIONAL IMPLEMENTATION AT 2200 UTC ON FRIDAY 29/02/08.
IT IS ANTICIPATED THAT THE MAJOR IMPACT OF THIS TRANSITION WILL
BE FROM 01/03/08 UNTIL 14/03/08.
.
MAASTRICHT FMP MAY INCREASE CAPACITIES WHERE POSSIBLE ON A
TACTICALBASIS, BASED ON OPERATIONAL EXPERIENCE WITH THE NEW
SYSTEM.
NORMAL CAPACITIES ARE EXPECTED ON OR BEFORE 31/03/08.
.
ADJACENT ACCS AND AIRCRAFT OPERATORS ARE ENCOURAGED TO
PARTICIPATE IN THE DAILY NMC CENTRA E-CONFERENCE AT 1500 UTC.
.
FULL INFORMATION WILL ALSO BE PUBLISHED IN NETWORK NEWS.
.
CFMU OPERATIONS DIVISION ON BEHALF OF MAASTRICHT FMP