PPRuNe Forums - View Single Post - Sikorsky S-92: From Design to Operations
View Single Post
Old 7th Feb 2008, 14:39
  #1011 (permalink)  
Vibetribe
 
Join Date: Sep 2005
Location: Brunei
Posts: 7
Likes: 0
Received 0 Likes on 0 Posts
Replacement Main, Input and Accessory modules are here and already assembled. The 4 Kevlar strops used for lifting the A/C were well protected, SAC Engineers did the math so No problems with the MRH at all.
As all three A/C are at similar hours the opportunity has been taken to carry out the first 1250hr insp early. Also gives us a chance to remove any critters that may have moved in. All the work will be carried out in the hangar because that is the professional way to perform Aircraft Maintenance.
Vibetribe is offline