Replacement Main, Input and Accessory modules are here and already assembled. The 4 Kevlar strops used for lifting the A/C were well protected, SAC Engineers did the math so No problems with the MRH at all.
As all three A/C are at similar hours the opportunity has been taken to carry out the first 1250hr insp early. Also gives us a chance to remove any critters that may have moved in. All the work will be carried out in the hangar because that is the professional way to perform Aircraft Maintenance.