The 2500m vis to which you refer is the required in-flight visibility (can only be assesed by the crew) - its not an RVR; the 'minimum' minimum RVR for a visual approach in JAR-OPS is 800m (reported/observed). In the UK you would have to call 'Visual' to ATC and recieve permission to continue with a visual approach - prior to passing the AB pt.